Lux Intelligent - Knowledge Base

We take being an easy company to work with very seriously and are constantly developing our customer support to offer more services, free, to customers.

How many tests can I program?

The panel can be programmed with up to 400 individual tests.  Luminaires can be allocated to up to fifty groups, which means any testing schedule can be carefully sculptured to the buildings exact requirements.  There are no limits as to the number of Luminaires allocated to a test group, so for example all 996 lights on a panel could be allocated to a single test group.

Can I force a manual test at any time?

The control panel allows various access levels to the panel.  If a user has level 2 access, the lights can be forced in to in to test for a duration specified by the engineer at the panel.  These results can also download similarly to any automated tests for documentation purposes.  Alternatively, they will be uploaded to cloud, the next time the monitoring PC downloads from that panel.